Troubleshooting • Repairs • Panel Upgrades • Renovations
Reliable electrical solutions for homes and commercial properties — every job permitted, inspected, and signed off to code.
Fast, accurate fault identification — tripping breakers, flickering lights, and hidden wiring failures diagnosed and resolved.
Dependable repairs for outlets, circuits, switches, and wiring — handled right the first time, every time.
100A to 400A capacity upgrades — FPL-coordinated, fully permitted, and inspection-ready.
Recessed, landscape, security, and custom fixture installs — interior and exterior, finished clean.
New outlets, GFCI receptacles, smart switches, and dedicated circuits installed to code.
Complete electrical scope for kitchens, bathrooms, home additions, and commercial buildouts — rough-in through final inspection.
100A to 600A
Built for modern power demands — full-scope upgrades from weatherhead to meter socket to main panel. FPL-coordinated, permitted, and inspected on every job.
Right-sized capacity for homes and commercial properties
FPL-approved, inspected, and signed off
Every upgrade is permitted, locally inspected, and FPL-coordinated through meter reconnection. FL Masters License EC13002571 — no shortcuts, no exceptions.
Tripping breakers, flickering lights, a burning smell near the panel, or fuses instead of breakers — don't wait. Address it before it becomes an emergency.
Multi-Unit Properties
Complete meter bank installations for apartments, condos, and commercial properties — FPL coordination, vault work, full assembly, and inspector sign-off handled start to finish.
Step 1 — Existing Meter Bank, Before Work Begins
Step 1 — Existing Wiring & Panel Condition
Step 2 — FPL Vault Before Patching (Pre-Seal)
Step 3 — Internal View, Meters Seated
Step 3 — Nearing Completion
Step 3 — Trough & Conductor Routing
Step 4 — Complete Meter Bank, Permitted & Inspected
Step 4 — Vault Patched & Restored
Two Complete Meter Bank Replacements — Same Location, Executed Back to Back with Minimal Resident Downtime
Power Saver Electric Corp completed two full meter bank replacements at the same multi-family property — two separate electrical rooms, both fully gutted and rebuilt. Through careful pre-planning, coordination with Florida Power & Light (FPL), and precise execution, both installs were completed while keeping resident outages to an absolute minimum.
Each installation was handled start to finish — demolition, individual feed staging, new meter bank assembly, main disconnect integration, emergency disconnect labeling, subpanel work, circuit directory sign-off, and final energization.
The result: two modern, code-compliant, fully labeled electrical distribution systems — properly permitted, inspected, and certified by PSEC's master electrician.
Working side-by-side with Florida Power & Light crews to execute the service cutover — precision timing, utility bucket trucks, and coordinated outage management across both properties.
FPL Bucket Truck & PSEC On Site During Cutover
Scheduling and executing a service cutover of this scale requires seamless coordination between PSEC crews and FPL utility personnel. Our team managed every aspect of the transition — from pre-scheduling the utility shutdown window to staging equipment and executing the cutover within the agreed outage timeframe.
Full meter bank replacement inside a concrete block utility room — wall cleared, individual circuit feeds staged, new 20-position meter stack assembled with internal wiring, emergency disconnect integrated, subpanel wired, fire alarm tied in, and circuit directory signed off.
Wall cleared — service feeds staged, awaiting new meter bank
New 20-meter bank — numbered, emergency disconnect, PSEC certified and energized
20-position meter bank fully assembled, wired, closed, and energized — internal wiring complete, PSEC subpanel with fire alarm tied in, circuit directory signed by John Marese.
Internal Wiring — 20 Meters Seated, Main Disconnect
Subpanel — PSEC Label, Fire Alarm, Emergency Disconnect
Panel Directory — Labeled & Signed by John Marese
Full replacement of an existing meter bank in the property's second electrical room — old bank demolished, individual feeds pulled and staged, new meter bank assembled with emergency disconnect, PSEC-labeled disconnect panel, and full service energization.
Existing meter bank documented prior to demolition — chalk-numbered units, CAUTION tag, old main disconnect labeled "1-OF-2 MAIN." Then: wall cleared and individual feeds pulled and staged for the new installation.
Existing Bank — Chalk Numbers, CAUTION Tag, Old Disconnect
Demo complete — wall cleared, individual feeds pulled and staged for new bank
New meter bank — PSEC certified, emergency disconnect, all units energized
New meter bank fully installed and energized — PSEC label, emergency disconnect, clean conduit routing, and meter socket on same CMU wall.
Side View — PSEC Label, Meter Socket, Disconnect Panel
Eight key capabilities demonstrated across both meter bank replacement projects
Direct scheduling and execution with Florida Power & Light — shutdown windows, bucket truck staging, and re-energization managed end-to-end.
Detailed outage management protocol kept resident downtime to an absolute minimum throughout both complete infrastructure replacements.
Full demolition of existing infrastructure, conduit preparation, meter bank assembly, individual unit metering, and final commissioning.
Code-compliant emergency disconnect systems installed on both properties — properly labeled, accessible, and meeting all NEC and FPL requirements.
Specialized expertise in large-scale multi-unit properties — from apartment complexes to condominium buildings requiring 16+ individual meter positions.
All work fully permitted, inspected, and signed off — meeting current NEC code, Florida Building Code, and FPL interconnection requirements.
Coordinated labor, materials, utility scheduling, permits, inspections, and resident communications across multiple active properties simultaneously.
Two complete meter bank replacements executed within days of each other — demonstrating PSEC's capacity to mobilize quickly at scale without compromising quality.
Safety & Capacity
Outdated fuse boxes replaced, amperage upgraded, and AFCI/GFCI protection added — every panel change built for safety, capacity, and full NEC compliance.
Arc-fault and ground-fault protection, code-compliant
Handle EV chargers, appliances, and future additions
Residential & Commercial
Reliable electrical work across every renovation scope — kitchens, bathrooms, home additions, and commercial tenant improvements, from rough-in through final inspection.
Dedicated Level 2 (240V) circuits for Tesla, ChargePoint, Clipper Creek, and all major brands — permitted, inspected, and utility-rebate ready.
Clear scope, clean execution, nothing left unchecked — on every single job.
System assessed, issues identified, scope defined — transparent pricing confirmed before any work begins.
NEC-standard work, permits pulled upfront, FPL coordination handled directly — no delays, no grey areas, no shortcuts.
Every installation tested and verified. Inspector coordinated directly — the job stays open until it passes. FPL standby crew coordination and local after-hours inspections available so your building goes back online immediately.
Work reviewed, everything labeled and explained — complete only when you're fully satisfied.
Professional electrical repairs, troubleshooting, and upgrades done right the first time.