South Florida Electrical Contractor

Reliable Electrical
Service & Repairs

Troubleshooting  •  Repairs  •  Panel Upgrades  •  Renovations

400A Max Service Capacity
20+ Years in Business
100% Permitted & Inspected
24/7 Emergency Service

Built for Every
Electrical Challenge

Reliable electrical solutions for homes and commercial properties — every job permitted, inspected, and signed off to code.

Troubleshooting & Diagnostics

Fast, accurate fault identification — tripping breakers, flickering lights, and hidden wiring failures diagnosed and resolved.

Electrical Repairs

Dependable repairs for outlets, circuits, switches, and wiring — handled right the first time, every time.

Panel & Service Upgrades

100A to 400A capacity upgrades — FPL-coordinated, fully permitted, and inspection-ready.

Lighting Installations

Recessed, landscape, security, and custom fixture installs — interior and exterior, finished clean.

Outlets & Switch Installs

New outlets, GFCI receptacles, smart switches, and dedicated circuits installed to code.

Renovations & General Work

Complete electrical scope for kitchens, bathrooms, home additions, and commercial buildouts — rough-in through final inspection.

100A to 600A

Electrical Service Upgrades

Built for modern power demands — full-scope upgrades from weatherhead to meter socket to main panel. FPL-coordinated, permitted, and inspected on every job.

What's Included

  • Service capacity upgrades — 100A, 125A, 150A, 200A, 225A, 400A, or 600A
  • Complete panel and meter socket replacement
  • Weatherhead, service mast, conduit runs, and weather-tight flashing
  • Main disconnect installation and labeling
  • Grounding rod, bonding, and ground system upgrade
  • FPL coordination, permitting, and inspection sign-off
  • In-house AutoCAD drawings — up to 800A load calculations, full permitting from planning to final

Up to 600A

Right-sized capacity for homes and commercial properties

Fully Permitted

FPL-approved, inspected, and signed off

Permitted & Inspected — Every Job

Every upgrade is permitted, locally inspected, and FPL-coordinated through meter reconnection. FL Masters License EC13002571 — no shortcuts, no exceptions.

Signs You Need a Service Upgrade

Tripping breakers, flickering lights, a burning smell near the panel, or fuses instead of breakers — don't wait. Address it before it becomes an emergency.

400 Amp Service Upgrade — Before & After
Before
Before — Original Service Panel Prior to Upgrade
Original service — prior to upgrade
During
During — New Panel, Conduit Runs & Service Upgrade In Progress
New panel & conduit runs — during installation
After
After — New Meter Socket & Service Mast Installed
New meter socket & service mast
Licensed & Permitted — FL Masters EC13002571

Multi-Unit Properties

Meter Bank Installations

Complete meter bank installations for apartments, condos, and commercial properties — FPL coordination, vault work, full assembly, and inspector sign-off handled start to finish.

What's Included

  • In-house engineered drawings — full AutoCAD capability, electronically signed and sealed
  • Load calculations, service planning, and maintenance of emergency lighting and power systems during rebuilds
  • Fire watch and life safety systems for sprinklered buildings
  • Multi-unit meter installations — up to 20+ meters
  • Individual tenant metering — each unit separately metered
  • Code-compliant panel layouts and circuit breakers
  • FPL utility coordination from start to energization
  • Numbered labeling and full circuit identification
  • FPL vault core-drilling, patching, and full restoration

Installation Process

1Utility coordination and permit activation
2Site preparation and vault access
3Meter bank assembly and wiring
4Final installation, inspection, and sign-off
Finished Installation PSEC Completed Meter Bank — Main Disconnect, Numbered Meters, Full Build-Out
Finished Meter Bank — PSEC Licensed & Permitted

Meter Bank Installation Process

1
Utility Coordination & Activation FPL permitting, vault access coordination, and service activation scheduling
2
Site Preparation & Vault Access Conduit core-drilling, plywood backing, bracket mounting, and vault rough-in
3
Meter Bank Assembly & Wiring Bus bar assembly, individual circuit wiring, breaker installation, trough runs, and labeling
4
Final Installation & Inspection Main disconnect installation, meter seating, numbered identification, inspector sign-off
FPL Vault Patching & Restoration Core holes sealed, vault fully patched and restored to original condition before FPL energizes
Installation Photos — Step by Step
PSEC Technician Inspecting Existing Meter Bank — Before Upgrade, Meters Still in Service Step 1 — Existing Meter Bank, Before Work Begins
Existing Panel — Loose Cables and Wiring Prior to Full Meter Bank Replacement Step 1 — Existing Wiring & Panel Condition
FPL Vault — Plywood Backboard Mounted, Conduit Core Holes Open Before Patching Step 2 — FPL Vault Before Patching (Pre-Seal)
Meter Bank Internal View — Main Disconnect Installed, Meters Seated, Conductors Routed Step 3 — Internal View, Meters Seated
Meter Bank Nearing Completion — Breakers Loaded, Disconnect Installed, PSEC Technician On Site Step 3 — Nearing Completion
Meter Bank Trough — Color-Coded Conductors Routed Through Bottom Trough to Each Meter Socket Step 3 — Trough & Conductor Routing
Completed Meter Bank — PSEC Labeled, Numbered, Main Disconnect, Fully Permitted and Inspected Step 4 — Complete Meter Bank, Permitted & Inspected
FPL Vault — Core Holes Patched with Concrete, Fully Sealed & Restored Step 4 — Vault Patched & Restored
Featured Project

Multi-Family Meter Bank Replacements

Two Complete Meter Bank Replacements — Same Location, Executed Back to Back with Minimal Resident Downtime

Power Saver Electric Corp completed two full meter bank replacements at the same multi-family property — two separate electrical rooms, both fully gutted and rebuilt. Through careful pre-planning, coordination with Florida Power & Light (FPL), and precise execution, both installs were completed while keeping resident outages to an absolute minimum.

Each installation was handled start to finish — demolition, individual feed staging, new meter bank assembly, main disconnect integration, emergency disconnect labeling, subpanel work, circuit directory sign-off, and final energization.

The result: two modern, code-compliant, fully labeled electrical distribution systems — properly permitted, inspected, and certified by PSEC's master electrician.

01

Installation One — Indoor Utility Room

Full meter bank replacement inside a concrete block utility room — wall cleared, individual circuit feeds staged, new 20-position meter stack assembled with internal wiring, emergency disconnect integrated, subpanel wired, fire alarm tied in, and circuit directory signed off.

Install 1 — Before & After
Before
Before — Wall Cleared, Service Cables Staged on CMU Floor, No Meter Bank Yet — PSEC Install 1

Wall cleared — service feeds staged, awaiting new meter bank

After
After — Completed 20-Position Meter Bank, Numbered Units, Emergency Disconnect, PSEC Label, Fully Energized — Install 1

New 20-meter bank — numbered, emergency disconnect, PSEC certified and energized

Install 1 During — Meter Bank Covers Off, Internal Wiring and Main Disconnect Visible, 20 Digital Meters Seated — PSEC Internal Wiring — 20 Meters Seated, Main Disconnect
Install 1 — PSEC Subpanel with Fire Alarm Control Panel and RainBird Controller, Emergency Disconnect Box, Clean Conduit Runs Subpanel — PSEC Label, Fire Alarm, Emergency Disconnect
Install 1 — Subpanel Door Open, Full Circuit Directory Labeled and Signed by John Marese 5-19-2026 — PSEC Panel Directory — Labeled & Signed by John Marese
02

Installation Two — Second Utility Room

Full replacement of an existing meter bank in the property's second electrical room — old bank demolished, individual feeds pulled and staged, new meter bank assembled with emergency disconnect, PSEC-labeled disconnect panel, and full service energization.

Install 2 Before — Existing Meter Bank with Chalk-Numbered Units, CAUTION Tag, and Old 1-OF-2 MAIN Disconnect — PSEC Existing Bank — Chalk Numbers, CAUTION Tag, Old Disconnect
Install 2 — Before & After
Before
Before — Wall Cleared, Individual Feeds Pulled and Staged, Ready for New Meter Bank — PSEC Install 2

Demo complete — wall cleared, individual feeds pulled and staged for new bank

After
After — New Meter Bank Fully Installed, PSEC Label, Emergency Disconnect, All Units Energized — PSEC Install 2

New meter bank — PSEC certified, emergency disconnect, all units energized

Install 2 Completed — Side Angle View, PSEC Label Top Right, Meter Socket, Emergency Disconnect, Intermatic Timers Above — PSEC Side View — PSEC Label, Meter Socket, Disconnect Panel
Project Highlights

Eight key capabilities demonstrated across both meter bank replacement projects

Utility Coordination with FPL

Direct scheduling and execution with Florida Power & Light — shutdown windows, bucket truck staging, and re-energization managed end-to-end.

Minimal Resident Power Disruption

Detailed outage management protocol kept resident downtime to an absolute minimum throughout both complete infrastructure replacements.

Complete Meter Bank Replacement

Full demolition of existing infrastructure, conduit preparation, meter bank assembly, individual unit metering, and final commissioning.

Emergency Disconnect Integration

Code-compliant emergency disconnect systems installed on both properties — properly labeled, accessible, and meeting all NEC and FPL requirements.

Multi-Family Electrical Infrastructure

Specialized expertise in large-scale multi-unit properties — from apartment complexes to condominium buildings requiring 16+ individual meter positions.

Code-Compliant Installation

All work fully permitted, inspected, and signed off — meeting current NEC code, Florida Building Code, and FPL interconnection requirements.

Professional Project Management

Coordinated labor, materials, utility scheduling, permits, inspections, and resident communications across multiple active properties simultaneously.

Rapid Turnaround Execution

Two complete meter bank replacements executed within days of each other — demonstrating PSEC's capacity to mobilize quickly at scale without compromising quality.

Safety & Capacity

Panel Changes & Upgrades

Outdated fuse boxes replaced, amperage upgraded, and AFCI/GFCI protection added — every panel change built for safety, capacity, and full NEC compliance.

Panel Services Include

  • Fuse box removal and modern panel installation
  • Amperage upgrades — 100A, 150A, 200A, or 400A
  • Arc-fault (AFCI) and GFCI breaker installation
  • Sub-panel additions and branch circuit expansion
  • Clean wire management, bundling, and routing
  • Accurate circuit labeling and panel directory
  • Whole-home surge protection — installed on every panel upgrade

AFCI & GFCI

Arc-fault and ground-fault protection, code-compliant

More Capacity

Handle EV chargers, appliances, and future additions

Panel Upgrade Panel Change and Service Upgrade
Panel Change & Service Upgrade — Completed

Residential & Commercial

Renovations & General Service

Reliable electrical work across every renovation scope — kitchens, bathrooms, home additions, and commercial tenant improvements, from rough-in through final inspection.

Services Include

  • Kitchen and bathroom remodels — full rough-in and trim-out
  • Home additions and new construction wiring
  • Commercial tenant improvements and office buildouts
  • Lighting installation — recessed, exterior, and custom fixtures
  • Outlet, switch, and GFCI receptacle upgrades
  • Level 2 EV charger circuits — permitted and rebate-ready

EV Charger Installations

Dedicated Level 2 (240V) circuits for Tesla, ChargePoint, Clipper Creek, and all major brands — permitted, inspected, and utility-rebate ready.

Renovation Work Electrical Renovation — Service & Panel Work
Renovation Electrical — Service & Meter Upgrade

The Same Standard
On Every Job

Clear scope, clean execution, nothing left unchecked — on every single job.

01

Assessment & Clear Scope

System assessed, issues identified, scope defined — transparent pricing confirmed before any work begins.

02

Code-Compliant Installation

NEC-standard work, permits pulled upfront, FPL coordination handled directly — no delays, no grey areas, no shortcuts.

03

Testing & Inspection

Every installation tested and verified. Inspector coordinated directly — the job stays open until it passes. FPL standby crew coordination and local after-hours inspections available so your building goes back online immediately.

04

Final Walkthrough

Work reviewed, everything labeled and explained — complete only when you're fully satisfied.

Licensed & Insured FL Masters License EC13002571
3rd Generation Contractor 40+ years of dependable electrical service
South Florida Service Area Broward & surrounding coastal counties
24/7 Emergency Service On-call for urgent electrical repairs

Need Reliable
Electrical Service?

Professional electrical repairs, troubleshooting, and upgrades done right the first time.