South Florida Electrical Contractor

Precision Electrical Infrastructure
for Vertical Transportation

NEC Article 620  •  3-Phase Power Systems  •  Permitted & Inspected

3-Phase Power Systems
NEC 620 Code Compliance
100% Permitted & Inspected
24/7 Emergency Service

Elevator Electrical Services

Engineered to NEC Article 620 — every component sized, routed, labeled, and inspected to the standard elevator systems demand.

Power Systems & Feeders

Dedicated 3-phase feeders sized to elevator motor full-load amperage — FPL-coordinated, load-calculated, and permitted on every project.

Control Disconnects

Disconnect switches engineered to NEC 620.51 — correctly sized to motor FLA, emergency-accessible, lockable, and permanently labeled.

Control Wiring & Coordination

Control circuit wiring and cab lighting circuits coordinated directly with elevator contractors — sequenced to eliminate installation conflicts from rough-in to commissioning.

Machine Room Electrical

House panels built for the machine room — dedicated circuits, complete labeling, organized conduit, and inspection-ready documentation on every project.

Code Compliance Upgrades

Existing elevator electrical systems brought to full NEC Article 620 compliance — upgrades designed, permitted, inspected, and signed off by the AHJ.

Troubleshooting & Repairs

Fast, accurate diagnosis of elevator electrical faults across disconnects, feeders, panels, pit wiring, and control circuits — resolved correctly the first time.

NEC Article 620 — Safety Critical

3-Phase Control Disconnects

Correctly sized, permanently labeled disconnect switches at emergency-accessible locations — engineered to NEC Article 620 requirements with no grey areas.

Disconnect Scope

  • 3-phase disconnect switches — properly sized to motor FLA
  • Emergency-accessible location per NEC 620.51
  • Permanent "ELEVATOR DISCONNECT" labeling
  • Weatherproof NEMA enclosures where required
  • Clean conduit runs and professional wire management
  • Dedicated cab light disconnect — separate, labeled

NEC Article 620 — No Exceptions

Elevator wiring operates under a stricter code than standard installations. Every disconnect, circuit, and enclosure is installed to specification — permits active, no deviations.

Control System Elevator Control Cabinet — Full Installed View
Elevator Control Cabinet — Installed & Wired
Elevator House Panel — Labeled Circuits inc. Pit Light, GFCI & Cab Light House Panel — Labeled Circuits
Elevator Service Disconnect Panel — Siemens, Mounted & Conduit Runs Service Disconnect — Installed
Elevator Hoistway — Conduit Runs, Junction Boxes & Guide Rail Hoistway — Conduit & Junction Boxes

Completed Installation — Control Room

Elevator Control Room — Full Scope

A fully commissioned control room — safety disconnects, cab light disconnect, control panel, and routed conduit throughout. Every component labeled, documented, and inspection-ready per NEC 620.

Elevator Control Room — Full Scope, Disconnects & Conduit Control Room — Full Scope
Elevator Disconnect — Side View, Conduit Entry Disconnect — Side View
Elevator Disconnect — Front View, Labeled & Installed Disconnect — Front View

Machine Room Infrastructure

Elevator House Panels

Dedicated elevator house panels — breakers sized to motor load, organized interior wiring, complete circuit directory, and fire-service emergency recall. First-visit inspection approval on every project.

Final Installation Elevator Control Cabinet — Final Installed & Inspection Ready
Control Cabinet — Final & Inspection Ready

Every Panel Includes

  • Main breaker sized to elevator motor full load
  • Dedicated circuits — no shared elevator loads
  • Elevator pit light circuit — clearly labeled
  • Pit GFCI receptacle circuit — per NEC 620.23
  • Cab light and elevator power circuits
  • Emergency recall wiring — fire service compliant
  • Clean wire management, tie-down, and bundling
  • Complete circuit directory — labeled on panel door
  • Final inspection coordination and code sign-off

Inspection Ready

Passes first-time inspection — every time

Fully Labeled

Permanent directory for future service access

Circuit Directory — Required by Code

A complete, permanent circuit directory is a code requirement — not a finishing touch. Every panel is labeled so elevator technicians and inspectors can work from it without guesswork.

Primary Power Infrastructure

Main Disconnects & Meter Cans

3-phase main disconnects and dedicated meter can installations — load-calculated, FPL-coordinated, positioned for emergency access, and fully compliant with NEC Article 620.

House Panel Elevator House Panel — Siemens, Labeled Circuits including Pit Light, Pit GFCI, Cab Light & Main Disconnect
House Panel — Labeled Circuits & Directory

Main Disconnect — Specifications

  • Sized to elevator motor full-load amperage
  • Fused or non-fused per elevator manufacturer spec
  • Within sight of elevator equipment — NEC 620.51
  • Permanent safety labeling — lockable for maintenance

Load Calculations — No Estimates

An undersized disconnect is a code violation and a fire hazard. Full load calculations are performed on every project — correct sizing, verified before installation, no exceptions.

3-Phase Meter Can — Installation

  • 3-phase meter socket — separate from building service
  • FPL utility coordination for service connection
  • Weatherproof enclosure and conduit sealing
  • Permits and inspection coordination included

Shaft & Pit Electrical Work

Pit Pipework & Conduit Runs

EMT and rigid conduit installed in elevator pits and shafts — correct support intervals, full NEC 620 compliance, and runs organized for elevator technician access and inspection.

Pit & Shaft Electrical Scope

  • EMT and rigid conduit installation in pit and shaft
  • Proper support and fastening per NEC 620
  • Pit lighting outlet — GFCI protected per NEC 620.23
  • Stop switch wiring at pit access point
  • Grounding and bonding of all metallic components
  • Organized runs accessible for elevator technicians

NEC 620.23 — Pit Safety, No Shortcuts

Every elevator pit requires a dedicated lighting outlet and GFCI-protected receptacle. These are code-mandated safety installations — installed on every project, no deviations.

Hoistway Wiring Elevator Hoistway — Surface-Mounted Conduit, Junction Boxes & Guide Rail
Hoistway — Conduit Runs & Junction Boxes
Elevator Pit — Floor-Level Conduit, Junction Boxes & Pit Infrastructure Elevator Pit — Floor-Level Conduit & Infrastructure

Designed for High-Stakes Electrical Work

Elevator electrical systems operate under stricter code requirements than standard wiring — and the consequences of poor workmanship are severe. NEC Article 620 mastery, precise installation sequencing, and elevator contractor coordination are non-negotiable on every project.

NEC & Elevator Code Authority

Full command of NEC Article 620, ASME A17.1, and local AHJ requirements. Installations engineered to pass first-visit inspection — every time, no callbacks.

Precision Installation

Conduit runs, wire sizing, load calculations, and panel layouts executed with exactness — not approximated. Work that elevator technicians can rely on from day one.

Elevator Contractor Coordination

Direct, ongoing coordination with elevator contractors from rough-in through final inspection — sequencing aligned to eliminate delays and conflicts at every phase.

Safety-Critical Execution

Emergency recall circuits, pit safety requirements, lockable disconnects, and system grounding — installed to specification on every project, without compromise or omission.

Disciplined from
First Visit to Final Sign-Off

A structured installation sequence — code-compliant at every phase, no improvisation.

01

Site Evaluation

Existing electrical infrastructure, elevator specifications, and AHJ requirements evaluated in full — before a single conduit is run.

02

Electrical Design & Planning

Load calculations, conduit routing, panel layout, and permit drawings completed and submitted before installation begins — engineered, not estimated.

03

Code-Compliant Installation

Sequenced with the elevator contractor and executed to NEC Article 620 standards — permits active throughout, inspections coordinated in advance.

04

Testing & Final Inspection

Every circuit tested and verified before the inspector arrives. AHJ coordination handled directly — the job is not complete until it passes final inspection.

Licensed & Insured FL Masters License EC13002571
3rd Generation Contractor 20+ years of South Florida electrical work
South Florida Service Area Broward, Miami-Dade & Palm Beach
Always Reachable On-call for urgent elevator electrical issues

Need Reliable Elevator
Electrical Work?

Professional electrical systems built for performance, safety, and long-term reliability.